Files
Basalt/docs/objects/Progressbar/setProgress.md
Robert Jelic bb1b1beb79 Basalt 1.7 Update
- New Objects (Flexbox, Graph, Treeview)
- Pluginsystem to add/remove functionality
- Reworked the entire Object system, instead of one big Object Class we have multiple classes: Object, VisualObject, ChangeableObject
- Instead of one big Frame Class we have multiple Frame Classes: BaseFrame, Frame, MovableFrame, ScrollableFrame, MonitorFrame, Flexbox
- Removed the Animation Object, and added a animation plugin instead
- Removed the Graphic Object and merged it's functionality with the image object
- Updated currently existing objects
2023-04-30 17:05:34 +02:00

745 B

setProgress

Description

This is the function you need to call if you want to change the progress of a ProgressBar.

Parameters

  1. number a number from 0 to 100

Returns

  1. object The object in use

Usage

  • Creates a ProgressBar and sets the current progress to 50:
local basalt = require("basalt")

local mainFrame = basalt.createFrame()
local progressBar = mainFrame:addProgressBar()
  :setPosition(3, 3)
  :setSize(20, 3)
  :setProgress(50)

basalt.autoUpdate()

In this example, a ProgressBar object is created and added to the mainFrame. The setPosition and setSize methods are used to adjust the position and size of the ProgressBar. The setProgress method is used to set the current progress to 50.